bridgelab

Construction Engineers

Stonecutters Bridge Hongkong Expert Witness

Twin Deck 1600 m long cable stayed bridge across the rambler channel on Route 8 in Hong Kong Harbour Area. Completed 2009.

Main Span 1018 m, Pylon Height 293 m

Owner: Hong Kong Department of Highways

Structural Engineering: Ove Arup & Partners

Contractors: Hitachi Zosen Inc. – Hsin Chong Group – Maeda Corporation – Yokogawa Bridge Corporation

Contribution of bridgelab by Roy Lengweiler : Expert Witness in the arbitration proceedings, representing the MHYH JV for Stay Cables, Deck Geometrie and Piertable Erection claim packages.  Preparation of independant Expert review report on the technical issues and construction management of these major claim packages.
Photo: Roy Lengweiler
Thumbnail By Baycrest – Own work, CC BY-SA 2.5, https://commons.wikimedia.org

Video: West Photography and CS Cheung – youtube

Next Post

Previous Post

© 2024 bridgelab

Theme by Anders Norén