bridgelab

Construction Engineers

Willerzeller Viaduct – Structural Assessment

Continouus composite girder with gerber Joints. Foundations on wooden piles anchored in highly sensitive torf SOIL Conditions. Built 1938 before flooding of the artificial lake (electric power supply for swiss federal railways). Piles always under water. cathodic corrosion protection of steel supports in operation since 1950.
45 Spans of 25 m.

Total length: 1115 m, Width of carriageway: 4.5 m
Feasibility study for strengtheng and repair of 80 Years old viaduct across the sihlsee reservoir by Prof. Thomas Vogel and Pascal Klein (2018).

Execution of strengthening works:
March 2022 – April 2024.
Owner: swiss federal railways
Photos: ETH ZURICH Image Archive (swissair Photo Collection)

Video: LosT69 Youtube

Next Post

Previous Post

© 2024 bridgelab

Theme by Anders Norén