Seven span balanced cantilever viaduct on the Plaridel arterial road Bypass in the vicinity of Manila, Capital of the Philippines. Five spans of 60.0 m each, two end spans of 50.0 m, total bridge Length 400.0 m. two Lanes, Overall Deck width 9.95 m.
Completion of first 400 m Stretch: 2018 Second Parallel Bridge in progress: 2019/2020
Design: Katahira & Engineers International
Main Contractor: Shimizu Corporation
construction engineering and Workshop drawings: SPECO (HK) Vietnam Representative Office
Construction Stage Analysis: Klein Engineering
Temporary Works Design and Site Supervision (Formwork Travellers, Pier Table Supports and site supervision): Faessler Engineering
Photos: Siah Chee Seng, SPECO (HK) Vietnam Representative Office