bridgelab

Construction Engineers

Anjikhad Cable Stayed Railway Bridge – Kashmir India

The Anjikhad Bridge is a Cable Stayed railway bridge in the Reasi district of Jammu and Kashmir in India.

Heigth above Anjikhad River: 210 m
Completion: July 2024

Cable Stayed Main span: 290 m

Owner:
Konkan Railway Corporation Ltd.

Contractor:
Hindustan Construction Company HCC

Designer:
Italferr – Ircon Intl. Ltd. – Northern Railway

Construction Method and Temporary Works Design:
Faessler Engineering, Niederteufen
Photo: highestbridges.com

Video: BH News

Next Post

Previous Post

© 2024 bridgelab

Theme by Anders Norén