bridgelab

Construction Engineers

Anjikhad Cable Stayed Railway Bridge – Kashmir India

The Anjikhad Bridge is a railway Cable Stayed bridge under construction in the Reasi district of Jammu and Kashmir in India.

Heigth above Anjikhad River: 210 m

Cable Stayed Main span: 290 m

Owner: Konkan Railway Corporation Ltd.

Contractor:
Hindustan Construction Company HCC

Designer: Italferr – Ircon Intl. Ltd. – Northern Railway

Construction Method and Temporary Works Design: Fässler Engineering, Niederteufen
Photo: Andreas Fässler

Rendering: Italferr Ltd

Next Post

Previous Post

© 2024 bridgelab

Theme by Anders Norén