Landmark Six lane cable stayed bridge on the Butterworth outer Ring road in Malaysia. Main Span: 185 m.
Completion 2006.
Bridge Designer: Seshadri Srinivasan – Dar Al-Handasah Consultants, Beirut-Kairo
Contractor: Ed. ZüBlin AG – IJM
Contribution of bridgelab by Roy Lengweiler: Expert Witness in the litigation proceedings for Technical and Construction Issues representing the Designers. Preparation of Expert Report and Expert Witness Hearings with Cross Examination at Malaysian High Court in Kuala Lumpur.