Construction Engineers

Roy Lengweiler

Roy Lengweiler is an independent structural engineer specialised in design and execution of cable stayed bridges. After a profound phase of conception, design and construction engineering at the headquarter of a leading stay cable company he implemented his know-how on site at mayor recent landmark projects such as Rama VIII Bridge in Bangkok, Sheikh Zayed Bridge in Abu Dhabi among others.

Roy Lengweiler is a founding member of the bridgelab network.
Services provided:

  • Structural Design
  • Concrete, Steel and Composite
  • Construction Engineering
  • Erection Schemes
  • Stage by Stage Analysis
  • Stay Cable Technology
  • Expertise

Roy Lengweiler, dipl. Ing. ETH
email

Next Post

Previous Post

© 2019 bridgelab

Theme by Anders Norén