bridgelab

Construction Engineers

Crestawald Bridge

Concrete arch bridge to be repaired. The arch shall be strengthened whereas a completely new deck will be erected on top of the arch. The full traffic load has to be taken by a temporary composite truss bridge during the period of construction.

Client: Federal Roads Office ASTRA

Bridge Repair Design:
Casutt Wyrsch Zwicky / Chitvanni + Wille GmbH
Temporary Bridge:

Supplier: Avo AG

Preliminary Design: Klein Engineering

Design: Synaxis AG / Fässler Engineering
Photo: Pascal Klein

Next Post

Previous Post

© 2024 bridgelab

Theme by Anders Norén