Asymmetric 4-lane road bridge with A-pylon over the Vistula River, main span 180 m, composite deck incrementally launched. Total Length 448 m. Completion 2000.
Client: Trasa Swietokrzyska
Structural engineering: Baks – Mestra Engineering
Contractors: BBR VT International Ltd – Mostostal Warszawa – Mostostal Pulawy
Stay cables, bearings and expansion joints: BBR Polska Sp. z.o.o. – BBR Systems Ltd. – Stahlton AG
Contribution of Pacal Klein : Installation manuals, quality documents, supervision of installation works on site by P. Klein (BBR Systems Ltd.)
Photo: Wikimedia Commons By Adrian Grycuk – Own work, CC BY-SA 3.0 pl, curid=77243045