bridgelab

Construction Engineers

Siekierkowski Bridge Warsaw

Twin Pylon Cable Stayed Bridge over the Vistula River in Warsaw. Motorway bridge with a main span of 250 m, composite deck incrementally launched on temporary piers. Total Length 750 m. Completion 2002.

Client: Transprojekt Gdansk Sp. z o.o.

Contractors: Campenon Bernard – Mostostal Warszawa – Warbud Joint Venture

Stay Cable Technology and Incremtal launching: BBR Polska SP. Z o.o.


Contribution of Pascal Klein: Cable project management, cable related and construction engineering on behalf of BBR Systems Ltd.
Photo: Transprojekt Gdansk SP. Z o.o.

Youtube: winkiel82

Next Post

Previous Post

© 2024 bridgelab

Theme by Anders Norén