bridgelab

Construction Engineers

Rama VIII Bridge – Bangkok

Single A-Pylon cable stayed bridge over the Chao Phraya River in Bangkog Thailand.
Main Span 300 m, Pylon Height 160 m.
Inaugurated May 7th 2002.


Owner: Bangkok Metropolitan Administration

Structural Engineering: Buckland & Taylor Ltd, Scott Wilson

Joint Venture: BBR VT International Ltd – China State Construction & Engineering Corporation – PPD Construction

Site Manager: Roy Lengweiler
Youtube: Anthony Liu Anudachakul – Siam Top View

Photos: By David McKelvey – Flickr: [1], CC BY 2.0, https://commons.wikimedia.org, curid=24086600

Next Post

Previous Post

© 2024 bridgelab

Theme by Anders Norén