bridgelab

Construction Engineers

King Zolu Duma Bridge Vai Town Monrovia Liberia

240 m long in situ balanced cantilever bridge across the Mesurado River with a main span of 100 m, deck width 13 m. Completion 2010.

Owner: Government of Liberia, Ministry of Public Works

Structural Design: GASH Bridge & Building Engineering Ltd.

Contractor: ChongQing International Construction Company (CICO)

Final Design, Shop Drawings and Geometry Control: Finley Engineering Group

Contribution of Pascal Klein: Design assistance and Third Party Checking
Photos: GASH Engineering

Next Post

Previous Post

© 2024 bridgelab

Theme by Anders Norén