Bính Bridge Hai phong Vietnam


Twin-pylon Cable Stayed Bridge with composite Deck (precast concrete slabs) across the Cam River connecting Hai Phong city with Thủy Nguyên District. Main Span 260 m. Total Length 460 m. Completion 2005.

Owner: Binh Bridge Project Management Unit (PMU – BINH)

Structural Design: Consortium of CHODAI and JOC in Association of FINNROAD & HECO

Contractor: I.H.I. Co. Ltd. – Shimizu Corporation – Sumitomo Construction, Speco (HK)

construction engineering and Workshop drawings For Pylons: SPECO (HK) Vietnam Representative Office

Contribution of Klein Engineering: Construction stage analysis, camber curves and step by step erection method

Temporary Works Design and Site Supervision (Formwork Travellers, Pier Table Supports and site supervision): SPECO (HK) Vietnam Representative Office