Construction Engineers

Austvoll III Bru, Viken Norway

Two lane highway bridge over the Hallingdalselve River. Prestressed concrete girder over five spans: 21.50 – 28.00 – 28.00 – 28.00 – 21.50 m.
Total length 139.00 m. Deck width 8.50 m.
Falsework made of Prewag Girders.

Client: Statens vegvesen
(Norwegian Public Roads Administration)
Design: Rambøll Norge AS
Contractor: Implenia Norge AS
Falsework Design: Klein Engineering

Construction period: 2021/2022

Photo: Axel Strand